> Brightcove | Garland Building Company Boston >

Brightcove

With big-name clients such as BBC Worldwide, Adobe, Johnson & Johnson, Ford, MasterClass, Forbes, and Live Nation, Brightcove needed a space as bright and innovative as their ideas and technologies. The Summer Street location is the online video platform company’s global headquarters and exudes creative energy and an inviting atmosphere.

 

Garland Building Company in partnership with Fusion Design Consultants, Currie Project Management and Commercial Construction Consulting (C3), brought the 31,000 SF space from brick and beam to bright and bustling. With over thirty meeting rooms, a variety of collaboration stations, individual offices and workspaces, an extensive kitchen, numerous café areas, and a recording studio, there is no shortage of room for creativity to flow seamlessly.

 

Upon exiting the elevator on the 6th floor, visitors and employees encounter custom wall graphics before entering the reception area. The front desk is custom-constructed millwork, with built-in LED lights and a media wall comprised of nine video displays. This floor has multiple large & small conference room spaces with advanced audio-visual technology making virtual meetings a breeze.

 

Up on the 7th floor, you will find an extravagant kitchen with an intricate wood and metal planter above the large island. To the left of the kitchen is a large seating area with an AV package ready for ‘All Hands’ meetings. This section of the 7th floor has acoustical baffles in the exposed ceiling to absorb excess noise. This floor houses Brightcove’s media studio which features a curved cyclorama wall enhancing the audio quality and backdrop for their video content. Additionally, there are numerous individual offices and conference rooms surrounded by demountable glass partitions. All around this space there are eye-catching works of art as well as plentiful greenery to liven the atmosphere.

TYPECorporate
LOCATION281 Summer Street
TEAMFusion
C3
Currie Project Management
SIZE31,000 SF
COMPLETED2022
PROJECT DURATION5 Months