>
Garland recently completed a 6,000 square foot phased Tenant and Lab fitout for a Cambridge based biomedical firm concentrating on Gene Therapy.
The renovation to the existing space required demolition of office, meeting and workspace areas to create 2 new labs plus an Acid Concentrator Lab (ACF) on the 1st floor of the space.
In order to complete the lab expansion there was a significant amount of piping and ductwork that needed to be installed outside of the work zone in existing lab environment work areas with extreme care and coordination over the 12-week project duration
| TYPE | Life Sciences |
| LOCATION | 301 Binney Street |
| TEAM | TRIA Genesis |
| SIZE | 6,252 SF |
| COMPLETED | 2022 |
| PROJECT DURATION | 6 Months |